New engineering designs: Scottish case study

Project to renovate and link two canals in Scotland

Historical background

  • 1790: opening of the Forth and Clyde Canal (Scotland's 31 canal)
  • 1822: opening of the Union Canal
  • The two canals allowed boats to cross the 32 part of Scotland
  • Locks (steps) connected the two canals near Falkirk
  • 1842: competition from a new 33
  • 1930s: the locks were demolished

Millennium project

  • Aim: to improve Scotland's 34
  • The long-term goal -- to strengthen the Scottish 35
  • Involved restoration of the two canals
  • Problem: one canal is 35m lower than the other

The Falkirk Wheel (a mechanical lift)

  • Completed in 2002
  • Two large tanks are attached to the ends of an arm
  • The tanks are designed to remain in a 36 position
  • A boat sails into each tank
  • The weight of the tanks with their contents is always 37
  • Little energy is needed to rotate the arm
  • Visual quality -- resembles a 38

Manufacturing

  • All the parts were constructed off-site
  • 1,200 tonnes of 39 were used
  • Joints were bolted and welded to reduce the effects of 40